NAME OF PLA |
CONSTRUCTION MANAGER |
TYPE OF PLA |
STATUS |
102 North End Ave - Site 25 Hotel Renovations |
F.J. Sciame |
Economic Recovery |
Finalized on February 28, 2011 |
108-11 Queens Blvd |
Gilbane/Kreisler and Borg |
Outer Borough Residential Market Recovery |
Finalized on August 16, 2012 |
11 Times Square Aquarium |
|
Economic Recovery |
Finalized on July 29, 2009 |
12-16 43rd Avenue, Long Island City |
Shawmut Design and Construction |
Economic Recovery |
Finalized August 21, 2009 |
123 Washington Street |
Tishman Construction Corp. |
Economic Recovery |
Finalized on July 29, 2009 |
127 East 79 street |
Lend Lease |
Manhattan Residential |
Finalized on April 3, 2012 |
130 West 12th Street |
Turner Construction Co. |
Economic Recovery |
Finalized on June 29, 2010 |
130 West 56th Street |
F.J. Sciame |
Economic Recovery |
Finalized on June 29, 2010 |
135 West 45th Street |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on October 28, 2010 |
1470 Madison Ave-Mount Sinai Center for Science and Medicine |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on June 4, 2010 |
150 Amsterdam Ave |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on May 15, 2009 |
150 Charles Street |
Plaza Construction Corp |
Manhattan Residential |
Finalized on April 12, 2012 |
150 West 62nd Street - Fordham Law School |
Gotham Construction |
Economic Recovery |
Finalized on Sept. 14, 2009 |
150 West 83rd Street (Redeemer Presbyterian Church) |
F.J. Sciame |
Economic Recovery |
Finalized on June 12, 2009 |
157 West 57th Street |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on August 3, 2010 |
160 Madison Avenue |
MD Carlisle |
Manhattan Residential |
Finalized on 12/9/13 |
160 West 62nd street |
Kreisler Borg Florman |
Manhattan Residential |
Finalized on July 25, 2012 |
170 Amsterdam |
Plaza Construction Corp |
Manhattan Residential |
Finalized on April 3, 2012 |
170 Central Park West (New York Historical Society) |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on July 27, 2009 |
175 West 60th Street |
West 60th Development |
Manhattan Residential |
Finalized on 3/18/14 |
1707 AFSCME MOU |
Newmark Knight Frank Construction |
other |
Finalized on August 23, 2011 |
1717 Broadway |
CNY Builder LLC |
Hospitality |
Finalized on 12/2/11 |
180 Broadway |
Tishman Construction |
Economic Recovery |
Finalized on March 23, 2011 |
200 & 300 North End Avenue |
Plaza Construction Corp |
Economic Recovery |
Finalized on June 12, 2009 |
200 Baychester Ave, The Mall of Bay Plaza |
Aurora |
Economic Recovery |
Finalized on July 16, 2012 |
200 East 79th Street |
200 East 79 street construction/Kreisler Borg Florman |
Economic Recovery |
Finalized on June 14, 2011 |
21 West 86th Street |
Sweet Construction |
Manhattan Residential |
Finalized on April 8, 2013 |
29 Flatbush Avenue |
Bovis Lend Lease, Inc. |
Outer Borough Residential Market Recovery |
Finalized on January 14, 2011 |
43-25 Hunter Street |
Hunter GC/ Rockrose |
Outer Borough Residential Market Recovery |
Finalized on 8/6/14 |
3 Columbus Circle 1775 Broadway |
Tishman Interiors |
Economic Recovery |
Finalized September 11, 2009 |
242 West 53rd Street |
Pavarini McGovern |
Manhattan Residential |
Finalized on 8/20/14 |
250 East 57th Street PLA |
Lend Lease |
Manhattan Residential |
Finalized on 10-3-12 |
285 Madison Avenue |
Structure Tone, INC. |
Economic Recovery |
Finalized July 10, 2013 |
306 West 44th Street (New 34 Story Hotel) |
Tishman Construction Corp. |
Economic Recovery |
Finalized on June 29, 2009 |
320 West 38th Street, New York, New York |
Kreisler Borg Florman |
Economic Recovery |
Finalized on August 21, 2009 |
330 Hudson Street |
Pavarini McGovern LLC |
Economic Recovery |
Finalized on May 11, 2012 |
330 West 39th Street |
Kreisler Borg Florman |
Economic Recovery |
Finalized on November 30, 2010 |
388 Bridge Street |
Cauldwell Wingate |
Outer Borough Residential Market Recovery |
Finalized on August 16, 2011 |
4 East 102nd Street |
Gotham Construction |
Economic Recovery |
Finalized on November 11, 2009 |
400 Park Ave. South |
Lend Lease |
Manhattan Residential |
Finalized on April 3, 2012 |
404 Park Ave South |
Sciame |
Manhattan Residential |
Finalized on April 26, 2012 |
413 East 69th Street New 20 Story Biomedical Research Bldg. (Cornell) |
Tishman Construction Corp. |
Economic Recovery |
Finalized on July 22, 2009 |
4300 Crecent Street |
Crescent GC LLC |
Outer Borough Residential Market Recovery |
Finalized on August 17, 2011 |
432 (440) Park Ave PLA |
Lend Lease |
Manhattan Residential |
Finalizes on July 16, 2012 |
440 West 42nd Street (42nd & 10th) |
Tishman Construction Corp./Related Companies |
Economic Recovery |
Finalized on September 21, 2009 |
440 West 42nd Street (interior work) |
Structure Tone, INC. |
Economic Recovery |
Finalized on April 12, 2010 |
441 East Fordham Road - Gabelli Business School |
Tishman Construction Corp. |
Economic Recovery |
Finalized Feb 9, 2011 |
450 West 37th Street - Dimenna Center for Classical Music |
Bar & Bar, Inc |
Economic Recovery |
Finalized on April 12, 2010 |
45th Street Hotel - 66-70 West 45th Street |
Pavarini McGovern LLC |
Economic Recovery |
Finalized september 14, 2009 |
45 Park Place |
Tishman Construction |
Manhattan Residential |
Finalized on 4/3/14 |
500 West 30th Street |
Related Companies |
Manhattan Residential |
Finalized on November 19, 2012 |
50 UN Plaza |
Lend Lease |
Manhattan Residential |
Finalized on October 1, 2012 |
50 West Street |
Hunter Roberts |
Manhattan Residential |
Finalized on 2/24/14 |
51 Astor Place |
Sciame |
Economic Recovery |
Finalized on May 11, 2012 |
520 Park Avenue |
Lend Lease |
Manhattan Residential |
Finalized 7/22/14 |
525 West 52nd Street |
Gotham Construction |
Manhattan Residential |
Finalized on 8/4/14 |
535 East 70th Street |
Morgan Construction Enterprise Inc. |
Economic Recovery |
Finalized on November 11, 2009 |
56 Leonard Street |
Lend Lease |
Manhattan Residential |
Finalized on April 3, 2012 |
West 57th Pyramid |
57 Pyramid Construction LLC |
Manhattan Residential |
Finalized on 10/16/13 |
605 West 42nd Street |
Tishman Construction |
Manhattan Residential |
Finalized on April 30, 2013 |
610 Lexington Avenue |
Pavarini McGovern |
Manhattan Residential |
Finalized on 8/20/14 |
620 Avenue of the Americas |
Henegan Construction Inc. |
Economic Recovery |
Finalized on November 30, 2010 |
680 Madison Ave Carlton House PLA |
Lend Lease |
Manhattan Residential |
Finalized on April 3, 2012 |
70 Pine Street |
Plaza Construction Corp |
Manhattan Residential |
Finalized on June 13, 2013 |
71 Laight Street PLA |
Sciame |
Manhattan Residential |
Finalized on September 7, 2012 |
7th Regimental Armory (643 Park Avenue) |
Tishman Interiors |
Economic Recovery |
Finalized on Novembr 11, 2009 |
700-708 First Avenue Commerical/Residential PLA |
Second Ave Development |
Manhattan Residential/ Economic Recovery |
Finalized on 4/15/14 |
80 DeKalb Avenue |
Forest City Ratner |
Economic Recovery |
Finalized on June 12, 2009 |
837 Washington Street |
Sciame |
Economic Recovery |
Finalized on July 16, 2012 |
839 6th Avenue |
M.D. Carlisle Construction Corp. |
Economic Recovery |
Finalized on October 20, 2009 |
855 6th Avenue |
Gotham Construction |
Manhattan Residential |
Finalized on 2/10/14 |
99 Church Street |
Tishman Construction Corp. |
Economic Recovery |
Finalized on June 29, 2009 |
99 Church Street |
Tishman Construction Corp. |
Manhattan Residential |
Finalized on May 17, 2013 |
Abraham Joshua Heschel School (West End Ave. & W 61st) |
F.J. Sciame |
Economic Recovery |
Finalized on October 12, 2010 |
ACLS West Tower- Roche Tenant Fit Out |
Tishman Interiors |
Economic Recovery |
Finalized on June 21, 2013 |
AETN |
Structure Tone, INC. |
Economic Recovery |
Finalized on June 13, 2012 |
Alexandria Center for Life Science |
Tishman |
Economic Recovery |
Finalized on Oct 10, 2012 |
Algonquin Hotel PLA |
Corner Stone |
Economic Recovery |
Finalized on June 22, 2012 |
Aqueduct Racetrack |
Tutor Perini Corporation |
Other |
Finalized on October 28, 2010 |
Armory Building 56 West 66th St. |
Skanska Construction |
Economic Recovery |
Finalized on January 10, 2011 |
Avalon Willoughby Square |
Avalon Bay |
Outer Borough Residential Market Recovery |
Finalized on 10/15/13 |
Avalon West PLA |
Avalon Bay |
Manhattan Residential |
Finalized on October, 19, 2012 |
Baccarat Hotel & Residence |
Tishman |
Manhattan Residential |
Finalized on March 19, 2012 |
BAM Residential Tower |
Gotham Construction |
Outer Borough Residential Market Recovery |
Finalized on 1/14/14 |
Barclays Center – 620 Atlantic Avenue |
Hunt Construction Group Inc. |
Economic Recovery |
Finalized on January 19, 2011 |
Beekman Tower |
Kreisler Borg Florman |
Economic Recovery |
Finalized June 12, 2009 |
BMW 555 West 57th street and 793 11th ave |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on July 8, 2011 |
Bronx Psychiatric Center |
Jacobs Project Managements |
Other |
Finalized on October 24, 2010 |
Broadway Marketplace @ GWB Bus Station |
Tutor Perini |
Public Works |
Finalized on 12/12/13 |
Brookfield PLA |
Tishman Construction |
Stand Alone |
Finalized on 3/4/14 |
Campbell Sports Center |
Structure Tone, INC. |
Economic Recovery |
Finalized on June 1, 2011 |
Carnegie Hall Studio Tower 881 Seventh Avenue |
Tishman Construction |
Economic Recovery |
Finalized on September 11, 2009 |
City Point B2 Tower 2 |
Lend Lease |
Outer Borough Residential Market Recovery |
Finalized on March 25, 2014 |
Clarett 111 Lawrence Street |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on September 11, 2009 |
Clinton Commons |
Monadnock Construction |
Prevailing Wage |
Finalized on March 15, 2012 |
Columbia Mixed Used development PLA |
Lend Lease |
|
Finalized on August 8, 2012 |
Columbia University NW Corner Building 550 West 120th Street |
Turner Construction Co. |
Economic Recovery |
Finalized on July 22, 2009 |
Columbia University Medical Center & Graduate Education Building |
Sciame Construction |
Economic Recovery |
Finalized on 12/11/13 |
Conde Naste Relocation |
Turner Construction Co. |
Economic Recovery |
Finalized July 25, 2013 |
Cornell University |
Tishman Construction |
Stand Alone |
Finalized on 5/15/14 |
CUNY Advanced Science Research |
Skanska Construction |
|
Finalized on July 7, 2007 |
CUNY Baruch College |
CUNY |
City Agency Renovation |
Finalized on August 26, 2011 |
CUNY Brooklyn College (Performing Arts) * based on NYC New Construction |
CUNY |
Other |
Finalized on November 29, 2010 |
Cuny College of Technology |
Sciame |
Public works |
finalized on March 1, 2012 |
CUNY Graudate Center 165 East 118th street |
Turner Construction Co. |
Other |
Finalized on April 12, 2010 |
CUNY LAW SCHOOL |
Turner Construction Co. |
City Agency Renovation |
Finalized on March 31, 2011 |
DASNY NEW CONSTRUCTION PLA |
|
|
Finalized on April 30, 3013 |
DASNY RENOVATION & REHABILIATION |
|
|
Finalized 2012 |
Delta Terminal |
Bovis Lend Lease, Inc. |
Other |
Finalized on February 4, 2011 |
Elinor Bunin Monroe Film Center (140 West 65th Street) |
Yorke Construction Corp. |
Economic Recovery |
Finalized on January 19, 2010 |
Ferry Point PLA |
NYC |
New Construction City Owned |
Finalized on March 7, 2012 |
Flushing Commons |
Tishman |
Outer Borough Residential Market Recovery |
Finalized on 10/15/13 |
Fordham Law School |
Gotham Construction |
Other |
Finalized on September 14, 2009 |
Gateway Phase II |
March Associates |
Economic Recovery |
Finalized on 1/16/13 |
Gotham Wes Building B & C |
Gotham Construction |
Affordable Housing |
Finalized on August 16, 2011 |
Gotham West Buidling A |
Gotham Construction |
Economic Recovery |
Finalized on August 17, 2011 |
Greenwich St. & Morton St. (Greenwich Dormitory) |
M.D. Carlisle Construction Corp. |
Economic Recovery |
Finalized on Oct. 20 2009 |
Harlem Children's Zone Promise Academy |
Tishman Construction Corp. |
City Agency New Construction |
Finalized on January 28, 2011 |
Howard Park |
Monadnock Construction |
Prevailing Wage |
Finalized on March 15, 2012 |
HPD - TIL PROGRAM |
HPD |
Other |
Finalized November 5, 2010 |
Hudson Yards |
Hudson Yards Construction LLC |
|
Finalized on January 16, 2013 |
Hunter College School of Social Work (2180 3rd ave) |
Turner Construction Co. |
Economic Recovery |
Finalized on June 29, 2009 |
Hunters Point South PLA |
Monadnock |
Affordable Housing |
Finalized on 1/16/13 |
Intergate |
Sabey IGM |
Private |
Finalized on April, 11 2012 |
International Gem Tower (55 West 46th street/44 West 47th street) |
Tishman Construction Corp. |
Economic Recovery |
Finalized on April 27, 2011 |
Jacob Javits Center |
Tishman Construction Corp. |
Other |
Finalized on Oct. 13, 2009 |
Jewish Home Lifecare |
Tishman Construction Corp. |
Manhattan Residential |
Finalized on May 9, 2013 |
JFK/LGA airport |
Holt Construction Corp |
Economic Recovery |
Finalized on Oct. 19, 2012 |
Kirby Relocation & Consolidation Project |
TDX Construction |
Public Works |
Finalized on 6/16/14 |
Kosciuszko Bridge |
Skanska |
Stand Alone |
Finalized on 5/23/14 |
La Triennale di Milano 40 West 53rd Street |
F.J. Sciame |
Other |
Finalized on October 12, 2010 |
Lafayette Manor |
Monadnock Construction |
Other |
Finalized on January 28, 2010 |
L&L Holding Project |
Structure Tone |
Economic Recovery |
Finalized on 1/23/14 |
Lincoln Center Complex Adjacent to West 65th Street |
Turner Construction Co. |
Economic Recovery |
Finalized on July 22, 2009 |
Lincoln Center Promenade |
RCDolner LLC |
Economic Recovery |
Finalized on July 22, 2009 |
Lincoln Center Theater # 3 (150 West 65th Street) |
Yorke Construction Corp. |
Economic Recovery |
Finalized on June 29, 2010 |
Madison Square Garden PLA |
Turner Construction Co. |
Other |
Finalized on July 2, 2010 |
Marriot Central Park – 1717 Broadway |
CNY Builder LLC |
Economic Recovery |
Finalized on November 5, 2010 |
Marriott Edition - 5 Madison Avenue |
Structure Tone, INC. |
Hospitality |
Finalized on February 10, 2013 |
Memorial Sloan Kettering Oncology Roof Pharmacy- 411-419 East 67th Street |
Turner Construction Co. |
Economic Recovery |
Finalized on June 1, 2011 |
Memorial Sloan Kettering ZRC Phase II Floor 4,5,6 Fitout |
Turner Construction Co. |
Economic Recovery |
Finalized on February 9, 2011 |
Memorial Sloan Kettering ZRC Phase II Ground Floor Fitout 425 East 68th street |
Turner Construction Co. |
Economic Recovery |
Finalized on February 22, 2011 |
Memorial Sloan Kettering ZRC Phase II Level Fitout 425 East 68th street |
Turner Construction Co. |
Economic Recovery |
Finalized on February 22, 2011 |
Memorial Sloan Kettering/CUNY Hunter |
Turner Construction |
Economic Recovery |
Finalized on 1/30/14 |
Metropolitan Museum of Art, 1000 Fifth Avenue |
RCDolner LLC |
Economic Recovery |
Finalized on August 21, 2009 |
Milford Plaza Hotel |
Turner Construction Co. |
Economic Recovery |
Finalized on June 29, 09 |
Millennium UN Plaza PLA |
Structure Tone, INC. |
similar to 1717 Broadway |
Finalized on June 22, 2012 |
Mount Sinai Center of Science & Medicine 1470 Madison Avenue |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on June 4, 2010 |
Museum for African Art 1280 5th Avenue |
Bovis Lend Lease, Inc. |
Economic Recovery |
Finalized on July 27, 2009 |
Museum of the Moving Image 36-01 35th Avenue |
F J Sciame Construction |
Economic Recovery |
Finalized on August 21, 2009 |
NHA Riverton School |
Turner Construction Co. |
City Agency Renovation |
Finalized on August 30, 2010 |
Nomura World Wide Plaza 825, 8th ave |
Turner Construction Co. |
Economic Recovery |
Finalized on June 16, 2011 |
Nordstrom 140 Fourth Avenue |
Ibex Construction |
Economic Recovery |
Finalized on November 11, 2009 |
North General Hospital (1879 Madison Ave) |
Gilbane |
Public works |
Finalized on February 27, 2012 |
NYC Agency DEP Reno |
|
City Agency Renovation |
Finalized on December 2010 |
NYC Parks - Bronx River Greenway Riverhouse |
|
City Agency New Construction |
Finalized on February 7, 2011 |
NYPI Lab Conversion |
Jacobs Project Mgmt |
Public Works |
Finalized on 4/23/14 |
New York Public Library |
Tishman Construction |
Economic Recovery |
Finalized on January 11, 2013 |
NYULMC Emergency Department (550 First Avenue Tisch Elevator Tower) |
Turner Construction Co. |
Economic Recovery |
Finalized on May 19, 2011 |
NYU Brittany Hall |
Tishman Interiors |
Economic Recovery |
Finalized on January 11, 2013 |
One West End Avenue |
Tishman Construction |
Manhattan Residential |
Finalized on 1/28/14 |
Ocean Breeze Athletic Facility |
|
City Agency New Construction |
Finalized on December 21, 2011 |
Penn South |
Mutual Redevelopment House |
Multi Location |
Finalized on December 21, 2011 |
Pier 32 |
Structure Tone, INC. |
Economic Recovery |
Finalized on January 12, 2011 |
Plumbers Union Local No.1 Headquarters - LIC |
Structure Tone, INC. |
Economic Recovery |
Finalized on 1/17/14 |
Queens Ballpark (Mets) |
|
Other |
Finalized on June 16, 2010 |
Queens West 4 |
TF Cornerstone |
Outer Borough Residential Market Recovery |
Finalized on July 27, 2009 |
Queens Hospital EMS Station |
NYC |
City PLA |
Finalized August 2013 |
Rego Park Mall Apt Tower |
Lend Lease |
Outer Borough Residential Market Recovery |
Finalized on 4/9/14 |
Residences at MoMa |
Lend Lease |
Manhattan Residential |
Finalized on 8/4/14 |
Riverside South Building K |
Tishman |
Manhattan Residential |
Finalized on September 7, 2012 |
Riverside Center Building 2 |
Tishman |
Manhattan Residential |
Finalized on October 18, 2012 |
Rockefeller University 1230 York Ave. |
Turner Construction Co. |
Economic Recovery |
Finalized on October 15, 2009 |
SCA |
NYC |
SCA |
Finalized on February 5, 2010 |
Schermerhorn State Office Building |
Hill International Inc |
Other |
Finalized on July 9, 2010 |
Sheraton Hotel |
Structure Tone, INC. |
Other |
Finalized on June 29, 2009 |
Sheraton Hotel New York-Public Spaces Renovation |
Structure Tone, INC. |
Economic Recovery |
Finalized on October 18, 2012 |
Skyview Parc Phases |
Tishman |
Outer Borough Residential Market Recovery |
Finalized on 9/26/13 |
Societe General 245 Park Ave |
Structure Tone, INC. |
Other |
Finalized on May 11, 2012 |
St. Mary’s Children’s Hospital Addition/Renovation |
Turner Construction Co. |
Economic Recovery |
Finalized on November 5, 2010 |
South Street Seaport |
Hunter Roberts |
Economic Recovery |
Finalized on 7/24/14 |
The New School – 65 Fifth Avenue |
Tishman Construction Corp. |
Economic Recovery |
Finalized on October 12, 2010 |
UBS Collocation Project |
Turner Construction Co. |
Economic Recovery |
Finalized Feb 22, 2013 |
United Nations |
|
Other |
Finalized on April 27, 2011 |
United Nations Consolidation Project |
Tishman Construction |
Stand Alone |
Finalized on 4/30/14 |
Walmart PLA |
Wal- Mart |
Other |
Finalized on July 22, 2009 |
West 57th St Pyramid |
Hunter Roberts |
Manhattan Residential |
Finalized on 10/16/13 |
West Village Residences |
Turner Construction Co. |
Manhattan Residential |
Finalized on December 5,2012 |
World Trade Center Tower 2 |
Turner Construction Co. |
Economic Recovery |
Finalized on January 6, 2009 |
World Trade Center Tower 2 Amendment |
Turner Construction Co. |
Economic Recovery |
Finalized on June 29, 2009 |
World Trade Center Tower 3 |
Tishman Construction Corp. |
Economic Recovery |
Finalized on January 6, 2009 |
World Trade Center Tower 3 Amendent |
Tishman Construction Corp. |
Economic Recovery |
Finalized on June 29, 2009 |
World Trade Center Tower 4 |
Tishman Construction Corp. |
Economic Recovery |
Finalized on June 29, 2009 |
Wykoff Cultural Education Center |
|
City PLA |
Finalized on 8/26/13 |
York II Residential Towers |
Second Ave Solow Development Corp. |
Manhattan Residential |
Finalized on August 17, 2012 |
|
|
|
|
Total |
|
|
195 |